Deglava Rezidence

Apartment no.

20

building

DALI

available

Price

155 737 €

Information

3

Rooms

C

Type of planning

4

Floor

NW

Sky side

6.7 m²

Balcony

64.5 m²

Area

71.2 m²

Total area

Building Structures

  • Load-bearing structure – prefabricated reinforced concrete walls, floors, and ceilings;
  • External walls – prefabricated three-layer reinforced concrete panels with integrated 200 mm thermal insulation;
  • Painted, easy-to-clean surface with long-term protection against microorganisms;
  • Walls between apartments made of prefabricated reinforced concrete elements to ensure structural strength, optimal temperature, and sound insulation;
  • Internal partition walls in apartments – metal frame clad with double-layer gypsum board on both sides.

Heating, Water Supply and Ventilation Systems

  • Each apartment is equipped with individual electronically readable heat, cold water, and hot water meters;
  • Centralized municipal sewage, heating, and water supply systems;
  • Heating via steel panel radiators with adjustable thermostats;
  • Mechanical exhaust ventilation from bathrooms (activated with the light switch) and kitchens;
  • Electric underfloor heating with thermostats in bathrooms.

Finishes – Windows, Doors

  • PVC windows with triple glazing on all floors
  • Apartment entrance doors – fire-resistant EI30, equipped with a peephole and lock;
  • Interior doors – laminated doors with a wooden frame and sound-insulating core.

Interior Finishes

  • Walls are filled, primed, and painted with washable paint; ceilings are also finished and painted;
  • Tiled walls and floors in bathrooms;
  • Bathtubs and shower cabins (in apartments with showers);
  • Faucets, sinks, and WC units;
  • Laminate flooring (Class 32, 8 mm) with sound insulation layer in living rooms, kitchens, and bedrooms.

Electrical Installation and Low-Current Systems

  • Electrical system with protection against electric shock;
  • Three-phase electrical connection, each apartment has its own electricity meter;
  • Sockets and switches in every room, lighting connection points installed, and provisions for kitchen appliances;
  • TV socket in the living room, fiber-optic internet cable in the hallway;
  • Intercom and access control system.

Common Areas

  • Tiled flooring;
  • Walls painted with washable paint;
  • One elevator in each building;
  • Built-in or surface-mounted internal lighting systems;
  • Protected sockets in technical rooms;
  • Mailboxes and a notice board.
Dali

Leave us a message and we will get back to you.

The visualisations of the project and the apartments used in the material are for information purposes only. During construction, elevations, finishes and technical specifications may be modified without notice in accordance with the terms of any contract entered into.
© 2026.DEGLAVA REZIDENCE. All rights reserved

Deglava Painters Residence Phase 3 is here!

Be one of the first to reserve an apartment in the Picasso or Rembrandt buildings.
Leave your email address and we'll get in touch with you!
Application form popup

Choose one of the fully furnished apartments in the Dali building!